What information is needed for site-specific RAMS?

Useful RAMS begin with a clear description of the work—not a template. This checklist helps contractors assemble the information needed before drafting starts.

Start with the job, not the document

A risk assessment should explain the hazards and controls relevant to the planned work. A method statement should explain how that work will be organised and carried out. If the author only receives a one-line scope, the result is likely to be generic, incomplete or delayed by repeated questions.

Before requesting RAMS, gather the best available information under the headings below. Not every point will apply to every job, but unexplained gaps should be identified rather than filled with assumptions.

1. Project and site details

  • Project name, address and exact work location.
  • Client, principal contractor and your organisation’s role.
  • Planned start, duration, working hours and required review date.
  • Site contact, access arrangements and local rules.
  • Relevant drawings, surveys, specifications and existing project information.

2. A clear scope and sequence

Describe what is being installed, removed, altered, cleaned, tested or repaired. Break the activity into a realistic sequence from delivery and access through setup, work, inspection, waste removal and handover.

Include interfaces with other trades and any stage where the area, equipment or responsibility changes. If a specialist contractor controls part of the method, identify that boundary.

3. People and supervision

  • Expected workforce and the supervisor responsible for the activity.
  • Skills, training, authorisations or experience required for the task.
  • Visitors, members of the public or neighbouring workers who could be affected.
  • Any lone working, young person, new starter or other relevant consideration.

4. Plant, tools, access and materials

List the actual equipment proposed, including access equipment, lifting accessories, temporary supports and power sources. Provide safety data sheets and product information for substances where relevant. Confirm delivery, storage, inspection and isolation arrangements.

5. Significant hazards and controls

Think beyond the immediate task. The RAMS may need to address work at height, services, temporary works, lifting, dust, noise, vibration, hot work, confined spaces, traffic, manual handling, fire, environmental controls and emergency response.

Controls should reflect the hierarchy of control and the real site conditions. PPE should not be used as a substitute for more effective measures where those measures are reasonably practicable.

6. Permits, coordination and emergency arrangements

  • Permits or authorisations required before work begins.
  • Services information, isolations and lock-off arrangements.
  • Exclusion zones, deliveries and traffic-management interfaces.
  • Emergency contacts, first aid, rescue and spill arrangements relevant to the task.
  • Briefing, sign-off, monitoring and review arrangements.

What if information is still missing?

Record the point as needing confirmation and assign it to the person who can make the decision. A document that openly identifies an outstanding design detail, lifting plan or isolation arrangement is more useful than one that quietly invents it.

A faster RAMS quotationSend the work scope, location, sequence, key equipment, available drawings, site rules and required date together. MacSafety Solutions can then identify the remaining questions and provide a clearer scope.

Related official guidance

For the Northern Ireland construction duty-holder framework, see the HSENI overview of CDM (Northern Ireland) 2016.

This article provides general information, not a risk assessment or legal advice. Requirements must be considered for the specific work, site and organisations involved.